NIT NO. 280/2022-23 DATED 13.09.2022 RELATED TO PD UNIT BHARATPUR FOR WORK OF CONDUCTING BBD SURVEY AS PER IRC-81-1997 INCLUDING TAKING SAMPLE FOR MOISTURE CONTROL AND TAKEN TEMPRATURE OF THE EXISTING CRUST AT THE TIME OF SURVEY. THE RATE INCLUDES CHARGE OF VEHICLE USED FOR CONDUCTING TEST MOBILIZATION OF MAN POWER MACHINERY TOLLS AND ALL CONSENABLE ITEMS FOR BANKELMAN BEAM TEST OF ALWAR BEHROR NARNAUL ROAD KM 108/0 TO 149/500 AND 165/0 TO 182/0 (SH-14)