The projects made by the corporation in the Roads and RUIDP works in recent past is as here under:

1. Pradhan Mantri Gramin Sarak Yojna (PMGSY) Works:-
Corporation is construcying new roads since year 2001-02 under Pradhan Mantri Gramin Sarak Yojana (PMGSY) project in the Districts Udaipur, Kota, Banswara, Sawai Madhopur, Tonk, Dholpur, Churu, Jhunjhunu, Sikar, Alwar and Barmer of Rajasthan state. These works of phase I to IV have been awarded to the corporation by Public Works Department Rajasthan on tender basis/actul plus basis. In this project 211 no. of roads measuring 754 km., costing Rs. 926.00 Million were taken up. All the roads have been completed.

2. Central Road Fund (CRF) Works:-
Corporation has completed the strengthening and carpeting works in the length of 189 km. costing Rs. 125.00 Million in Districts of Alwar, Baran, Jhunjhunu and Dholpur.

3. Rural Road Upgradation Programme (RUP) Works:-
These Road works in this scheme were allotted by the Public Works Department Rajasthan on tender basis/actual plus basis. Corporation has already completed the upgradation of various rural roads in approximate length of 900 km., costing Rs. 315.00 Million during the years 2001-02 to 2004-05. These roads have been upgraded in the Dholpur, Bharatpur, Kota, Jhalawar and Baran District of Rajasthan.

4. Rajasthan Urban Infra Structure Development Project (RUIDP) Works:-
On the basis of tendering, 7 works of area development including one work of ROB at Jodhpur were awarded by the RUDIP amounting to Rs. 573.00 Million. These works are being carried out in towns at Ajmer, Bikaner, Jodhpur, Kota and Udaipur. These works include providing and laying Sewer lines, Water Supply lines, Cement Concrete roads, Bituminous roads and Drains etc. 

5. Road Modernisation & Upgradation Project ( RMUP) Works.
The road work in this scheme work allotted by Public works department Rajasthan on actual plus basis. In this project 126 Nos of road measuring 296.9 KM costing Rs: 121.46 million were taken up. The works are in progress and out of 126 Nos of roads 12 Nos have been completed.

6. Other Road Works: (a) Construction of Service Road at BhandanwaraTown in District Ajmer. This work has been awarded by NHAI on actual plus basis costing Rs: 807 million. The work has been completed. (b) Construction of Internal Road at Lignite mines at Kasnav Mata Sukh in District Nagaur. This work has been awarded by Rajasthan by Rajasthan state mines & minerals department ( RSMN) costing Rs: 2.98 million. The work has been completed.

MAJOR WORKS COMPLETED

The corporation has successfully executed works in the following infrastructure sectors :- 
01 Road and Highways.
02 WB funded highway projects
03 Aqueducts.
04 Intake structures.
05 High level and submersible bridges.
06 Rail Road over Bridges and Flyovers.
07 Thermal power plants.
08 Institutional and Residential complexes (turn key basis).
09 Industrial buildings.
10 University complexes.
11 B.O.T.-ROB projects-10 nos. Approx cost Rs. 100 Crore.
12 Construction of Office & Residential complex at Udaipur.
13 Construction of Jail Building and Police line building at Kota-approx cost 43 Crore.
14 Construction of Kota Bye Pass and Sumersible bridge across Chambal near Kota
approx cost RS. 33 Crore.
15 BOT Road project Challa/ Neem Ka Thana/ Kotputli approx cost 19 Crore.
16 BOT Road project Sriganganagar/ Hanumangarh approx cost 15 Crore.
17 BOT Road project Sikar - Challs approx cost Rs. 30.00 Crore
18 ROB at L.C No. 71-A at Hanumangard Junction & Linking Road network approx cost 35.00 Crore
19 BOT Road Project Sri Ganganagar - Padampur Road approx cost 14.00 Crore
20 BOT Road Project Shahpura - Ajeetgard- Chomu. Rs 30.00 Cr.
 
: :